Beards of Bartley Corp 2016
Introducing Mr. April: David Lazaro
Primary Responsibility: Facility Foreman
Years at Bartley Corp: 12 Years
Each month in 2016, Bartley Corp will be showing off a different employee’s beard that was selected in our 2016 Beards of Bartley Corp calendar. If you would like a calendar, no problem, let your Bartley point of contact know while supplies last.




























ges faced on the project included unique window jambs and an elevator shaft. Many of the windows called for the sides of the window block out to be at 105-degrees rather than perpendicular to the face of the wall. The 3-story elevator shaft challenged the safety on the jobsite with openings that were constantly managed. The shaft was produced by first forming the outside of the elevator shaft and then, when the walls were ready to be closed, a crane carefully placed large interior panels on the inside of the wall.









