Work Zone Cam

To take time elapsed pictures of the Clifton Concrete Home construction process, we installed a Work Zone Camera on Thursday May 9th. Every 30 minutes we get a nice 6 megapixel overhead shot of the job site. Not many people are familiar with building concrete homes so the time lapsed pictures will provide a visual timeline. Here we show the overhead shot it will take (with myself pictured for a size reference). We also started laying out the cut points for our excavation crews. More to come soon!!

20130509-210308.jpg.

IMG_2509

2013-05-16 Excavation Cut Layout