Pick your ❤ favorite Pic – May Contest & April Winner ?



 

 

Winner from April’s Voting

Flying high to victory was the sound studio concrete wall pour assisted by one of our Bartley concrete pumps. 
Thanks for voting!

 

 

 

 

Vote for your favorite Bartley Corp pic from May!

Which picture do you like the best?
(Click on the link under the picture to place your vote)

*|SURVEY:Picture 1|*



*|SURVEY:Picture 2|*



*|SURVEY:Picture 3|*



*|SURVEY:Picture 4|*



*|SURVEY:Picture 5|*


The winner will be announced with next month's voting. 

Have a great one!
Your Friends at Bartley Corp

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Copyright © *|CURRENT_YEAR|* *|LIST:COMPANY|*, All rights reserved.
*|HTML:LIST_ADDRESS_HTML|* *|END:IF|*Want to change how you receive these emails?
You can update your preferences or unsubscribe from this listBartley Corp
Email: [email protected] 
Call: 301-384-2700*|IF:REWARDS|* *|HTML:REWARDS|* *|END:IF|*

 

 

 

 

 

Related Posts

Article about Bartley Corp – Adding a Ramp to a Parking Deck – Concrete Contractor Magazine

Concrete Contractor Magazine

https://www.forconstructionpros.com/concrete/article/20999105/adding-a-ramp-to-a-parking-deck

http://cfawalls.org/concretefacts/2018/09/06/projects-of-the-year-customer-challenges-deliver-award-winning-results/

The top level of this Baltimore parking ramp was once a pedestrian plaza but the need for 150 new parking spaces led to a rehab project performed by the Bartley Corporation.

 

Related Posts

Pick your ❤ favorite Pic – April Contest & March Winner ?

 

 



Winner from March’s Voting

Okay, I guess that wasn’t even fair having a toddler (Will Bartley) in a hard hat up for voting. This month, the options are a little more competitive
Thanks for voting!

Vote for your favorite Bartley Corp pic from April!

Which picture do you like the best?
(Click on the link under the picture to place your vote)

*|SURVEY:Picture 1|*



*|SURVEY:Picture 2|*



*|SURVEY:Picture 3|*



*|SURVEY:Picture 4|*



*|SURVEY:Picture 5|*


The winner will be announced with next month's voting. 

Have a great one!
Your Friends at Bartley Corp

Copyright © *|CURRENT_YEAR|* *|LIST:COMPANY|*, All rights reserved.
*|HTML:LIST_ADDRESS_HTML|* *|END:IF|*

Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list

Bartley Corp
Email: [email protected] 
Call: 301-384-2700

*|IF:REWARDS|* *|HTML:REWARDS|* *|END:IF|*

 

Related Posts

Pick your ❤ favorite Pic – March Contest & February Winner ?

 

 



Winner from February’s Voting

The Oscar for best logo in concrete goes to …. The Bartley Corporation!
“You like me, you really like me.” 

Thanks for voting!

Vote for your favorite Bartley Corp pic from March!

Which picture do you like the best?
(Click on the link under the picture to place your vote)

*|SURVEY:Picture 1|*



*|SURVEY:Picture 2|*



*|SURVEY:Picture 3|*



*|SURVEY:Picture 4|*



*|SURVEY:Picture 5|*


The winner will be announced with next month's voting. 

Have a great one!
Your Friends at Bartley Corp

Copyright © *|CURRENT_YEAR|* *|LIST:COMPANY|*, All rights reserved.
*|HTML:LIST_ADDRESS_HTML|* *|END:IF|*Want to change how you receive these emails?
You can update your preferences or unsubscribe from this listBartley Corp
Email: [email protected] 
Call: 301-384-2700*|IF:REWARDS|* *|HTML:REWARDS|* *|END:IF|*

 

Related Posts

Pick your ❤ favorite Pic – February Contest & January Winner ?

 

 



Winner from January’s Voting

Back to back, photos from the same project win in Jan and Dec!
Thanks for voting!

Vote for your favorite Bartley Corp pic from February!

Which picture do you like the best?
(Click on the link under the picture to place your vote)

*|SURVEY:Picture 1|*



*|SURVEY:Picture 2|*



*|SURVEY:Picture 3|*



*|SURVEY:Picture 4|*



*|SURVEY:Picture 5|*


The winner will be announced with next month's voting. 

Have a great one!
Your Friends at Bartley Corp

Copyright © *|CURRENT_YEAR|* *|LIST:COMPANY|*, All rights reserved.
*|HTML:LIST_ADDRESS_HTML|* *|END:IF|*Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list

Bartley Corp
Email: [email protected] 
Call: 301-384-2700

*|IF:REWARDS|* *|HTML:REWARDS|* *|END:IF|*

 

Related Posts

Pick your ❤ favorite Pic – January Contest & December Winner ?

 



Winner from December’s Voting

Wood you believe Bartley’s custom wall prep took 3/4 of the votes in December?
Thanks for voting!

Vote for your favorite Bartley Corp pic from January!

Which picture do you like the best?
(Click on the link under the picture to place your vote)

*|SURVEY:Picture 1|*



*|SURVEY:Picture 2|*



*|SURVEY:Picture 3|*



*|SURVEY:Picture 4|*



*|SURVEY:Picture 5|*


The winner will be announced with next month's voting. 

Have a great one!
Your Friends at Bartley Corp

Copyright © *|CURRENT_YEAR|* *|LIST:COMPANY|*, All rights reserved.
*|HTML:LIST_ADDRESS_HTML|* *|END:IF|*Want to change how you receive these emails?
You can update your preferences or unsubscribe from this listBartley Corp
Email: [email protected] 
Call: 301-384-2700*|IF:REWARDS|* *|HTML:REWARDS|* *|END:IF|*

 

Related Posts

Pick your ❤ favorite Pic – December Contest & November Winner ?

 

 

Help Bartley vote for the best pic

View this email in your browser



Winner from November’s Voting

Turning the corner to victory was the radius wall of Picture #1
Thanks for voting!

Vote for your favorite Bartley Corp pic from December!

Which picture do you like the best?
(Click on the link under the picture to place your vote)

*|SURVEY:Picture 1|*



*|SURVEY:Picture 2|*



*|SURVEY:Picture 3|*



*|SURVEY:Picture 4|*



*|SURVEY:Picture 5|*


The winner will be announced with next month's voting. 

Have a great one!
Your Friends at Bartley Corp

Copyright © *|CURRENT_YEAR|* *|LIST:COMPANY|*, All rights reserved.
*|HTML:LIST_ADDRESS_HTML|* *|END:IF|*Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list

Bartley Corp
Email: [email protected] 
Call: 301-384-2700

*|IF:REWARDS|* *|HTML:REWARDS|* *|END:IF|*

 

Related Posts

Pick your ❤ favorite Pic – November Contest & October Winner ?

 

Help Bartley vote for the best pic

View this email in your browser



Winner from October’s Voting

Picture #5 soared above the competition in October!!  Thanks for voting!

Vote for your favorite Bartley Corp pic from November!

Which picture do you like the best?
(Click on the link under the picture to place your vote)

Picture 1



Picture 2



Picture 3



Picture 4



Picture 5


The winner will be announced with next month's voting. 

Have a great one!
Your Friends at Bartley Corp 

Copyright © 2017 Bartley Corp, All rights reserved.

Bartley Corp

16613 New Hampshire Ave

Silver Spring, MD 20905

Add us to your address book

Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list

Bartley Corp
Email: [email protected] 
Call: 301-384-2700

Email Marketing Powered by MailChimp

 

Related Posts

Pick your ❤ favorite Pic – October Contest & September Winner ?

 

 

Help Bartley vote for the best pic

View this email in your browser



Winner from September’s Voting

Picture #2 endeared the most votes!! Was it David or the metal deck or the Chesapeake Bay that you liked so much? Thanks for voting!

Vote for your favorite Bartley Corp pic from October!

Which picture do you like the best?
(Click on the link under the picture to place your vote)

Picture 1



Picture 2



Picture 3



Picture 4



Picture 5


Picture 6

The winner will be announced with next month’s voting. 

Have a great one!
Your Friends at Bartley Corp 

Copyright © 2017 Bartley Corp, All rights reserved.

Bartley Corp

16613 New Hampshire Ave

Silver Spring, MD 20905

Add us to your address book

Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list

Bartley Corp
Email: [email protected] 
Call: 301-384-2700

Email Marketing Powered by MailChimp

 

Related Posts

Cheat sheet on reading AIA progress bills

I’ve grown to love and understand AIA billing but I admit it took some time to fully understand. This quick guide can get you into the comfort zone and start having a more satisfying relationship with a busy looking form created by The American Institute of Architects. Plus I couldn’t find an article that explains the basics of AIA billing in fun simple words.

 

Question: What the heck is AIA Billing and why do it?

Answer: AIA billing can clearly show you the work completed for a particular month, work that has already been completed and the remaining work to be done. This uniform document helps owners, contractors, subcontractors, banks and anyone involved in reviewing / approving a bill usually related to construction.

 

You just received an AIA bill – don’t freak out, just follow these tips to understand the cover page

  • All you need to read is Line 8 labeled Current Payment Due

Honestly you can skip the rest if you simply create an Accounts Payable invoice for the amount on Line 8 since this is the payment due for this individual progress billing. Note: You can trust this step only if you have a reliable subcontractor like Bartley Corp using the form correctly out of their Construction Accounting Software.

  • The Original Contract Sum on Line 1 should not change

As long as Line 1 matches the amount from the original contract you are good. Move on.

  • Adds / subtracts to contract work should be summed up in Line 2 Net Change by Change Orders

Hopefully this stays zero (hurray) unless you needed to add or subtract work (boo).

  • Payments billed are summed up in Line 7 Less Previous Certificates for Payment

This should match what you have paid up until this particular billing.

 

Crave more? Yes read on, otherwise I think you can get by and I’ll send you a diploma

  • Remaining work that has not been completed is on Line 9 Balance to Finish

The total of the contract and change order work left to be completed is found on Line 9.

  • Be a friend and don’t require Retainage

If you require retainage, you’ll get pushback from subcontractors and make this more difficult. Line 5 Retainage shows the percentage for the job and totals the amount taken out through the current billing. It will affect Lines 5-9 but should not alter numbers on Lines 1-4.

  • Pages 2+ show you the detailed line items

Here you’ll see a Description of the line item with a column for Schedule Value, Completed This Period and the Balance.

 

Don’t be afraid of AIA. Embrace the clarity and simplicity.

 

One of your many friends at Bartley Corp,

Andy Bartley

Related Posts